"Both of Michigan's major utility monopolies have been on a rate-hike spree that is accelerating in lockstep with their data center expansion. Consumers Energy just received approval for a $276.6 million electric rate increase in March. DTE, which obtained a $217 million increase in January 2025—following a $368 million increase in December 2023—filed for a $574 million increase in April, explicitly tied to infrastructure needed to serve the Saline Township data center." https://mitchellryandistinphd.substack.com/p/the-real-truth-behind-data-centers
Remote
Loren
@bondurant@a2mi.social
46 Followers
67 Following
6 Posts
Joined January 04, 2023
Open post
"A.I. as a War Issue, War as a Workers’ Issue: The fight against the University of Michigan–Los Alamos data center."
https://www.aaup.org/ai-war-issue-war-workers-issue #AnnArbor #Ypsilanti
0
0
1
0
Open post
"While Ann Arbor has received accolades for its bike infrastructure, local activists believe more can be done to protect those traveling by non-motorized means." 💯 #AnnArbor https://concentratemedia.com/ann-arbor-cycling-activists-are-pedaling-toward-a-safer-future/ (h/t Elias)
0
0
0
0
